본문으로 바로가기
playbooks.detail.backToHome
playbooks.types.casestudyplaybooks.topics.mining

How SQM Achieved 4x Iodine Yield Improvement and Cut Inspection Time by 99%

SQM operates 80 leaching heaps across 678 km² of Atacama Desert. A disconnected sprinkler or a dry zone could silently cut iodine yield for weeks before anyone on the ground noticed. Manual inspection simply could not keep pace with the scale of the operation.

This case study documents how SQM deployed an autonomous drone program through FlytBase, built a Computer Vision pipeline on top of it, and transformed a 2 to 3 week inspection cycle into a daily morning briefing. In 8 to 10 months, iodine concentration improved from 0.5% to 2%. Hazardous terrain exposure dropped 70%. Four more docks are already on order.

How SQM Achieved 4x Iodine Yield Improvement and Cut Inspection Time by 99% cover

무료 다운로드

How SQM Achieved 4x Iodine Yield Improvement and Cut Inspection Time by 99% 어디로 보내야 할지 알려주세요.

녹화 영상 링크도 이메일로 보내드릴 예정이니, 이어서 시청하실 수 있습니다.


안에 무엇이 들어있나요?

소송을 진행하고 프로그램을 운영하는 데 필요한 모든 것