Pilot Shift Scheduler

Pilot Shift Scheduler weekly Gantt timeline with pilot rows and mission panel

Most ROC operations managers run twenty pilots across half a dozen sites. They build the next week's roster in a spreadsheet. The conflicts hide there until the morning the schedule has to ship. Pilots tap out, docks get double-booked, waivers miss the sortie. Pilot Shift Scheduler holds every variable in one live workspace. It surfaces conflicts the moment they appear. The week you publish becomes the week that actually runs.

The manager opens one workspace for the week. Every pilot, dock, mission, and qualification lives on the same screen. Drag a mission onto a pilot's shift. The system runs eleven rules against the placement. Expired certifications and dock recharges surface immediately. The manager publishes only when every conflict is resolved. The week locks, the audit log writes, the team works what ships.