انتقل إلى المحتوى الرئيسي
ومضات
ROC operations

Pilot Shift Scheduler

Drag missions onto shifts. See conflicts the moment they appear. Publish a week the team actually trusts.

Pilot Shift Scheduler weekly Gantt timeline with pilot rows and mission panel

A ROC operations manager coordinating 10 to 30 pilots across multiple sites makes dozens of micro-decisions every week, and Pilot Shift Scheduler holds every variable in one workspace, from pilots and qualifications to docks, recharge windows, BVLOS supervisor cover, leave, and certifications, surfacing conflicts the moment they appear so the week you publish is the week that actually runs.

The Gantt timeline is the source of truth. Each pilot occupies a row, the week runs Monday to Sunday across the top, shift bars sit at exact times, mission blocks sit inside shifts. Drag a mission onto a shift to assign it. The Resource Panel below shares the same time axis and shows dock utilization and supervisor coverage. Conflict flags surface in place as the schedule changes. A confidence score in the header updates in real time so you know before publish whether the week is ready to ship.